
2026-05-19
Deputy Chairman of the Government of the Russian Federation Marat Khusnullin said that the planned volume of housing commissioning in 2026 will be 103 million square meters, which is 5.2% higher than the previous year. Massive housing construction is driving increased demand for fire piping systems. Due to their ease of installation and high seismic resistance, comb fittings have become the preferred solution for installing fire communications in high-rise residential buildings.
According to industry statistics, fire systems account for 28.7% of all comb fitting usage. Since all new residential properties are equipped with automatic sprinkler systems, the demand for comb fire fittings in the Russian market is projected to increase by more than 12% by the end of 2026. At the same time, government investments in the modernization of fire communications of existing buildings are growing annually, which ensures a constant increase in market demand.